Spain remains one of the primary markets for Audax Renovables.
Photovoltaic portfolio in Spain
https://www.audaxrenovables.com/wp-content/uploads/2021/02/Leyenda-tablas-PV-Wind_EN.jpg
Early Stage => Connection point has been requested, and less than 50% of necessary land has been procured.
Grid Connection => The project has obtained grid connection, and at least 50% of the necessary land has been procured.
Backlog => Most of the permits have been requested.
Under Construction => The Project is in the stage of Ready to Build (RTB) or under construction.
Operation => The Project is operating.